Works performed
Soil Study New Panama Canal, currently
In the works of study of grounds on the platform the equipment of perforation is placed for the obtaining of geological samples of the subsoil, and with the stability and security, a period of work is obtained with a 100% of effectiveness in the works without damages to the equipment of perforation.